BACKGROUND
Large manufacturer of specialised medical glass products. Total Solar was approached as Glass Expansion sought to deal with a reputable installer who could provide quality advice and installation. Our site-specific assessment revealed prolific coastal birdlife, with much of the roof area subjected to a considerable volume of bird droppings. For this reason, wecarefully designed this 300 kW solar system with particular attention to ease of practical solar panel cleaning over time, as well as utilising multiple additional inverters to provide greater redundancy whereby if sections of solar panels in Melbourne are soiled, the energy production losses are isolated. While the multiple additional inverters increased the upfront installation cost, the customer’s actual energy savings have demonstrated that the design was highly successful from an upfront cost vs energy benefit over time perspective.
No. of panels: | 732 x Winaico 410 W WST-MGX-P3 GEMINI Solar Panels |
System size: | 300 kW |
Inverter: | 12 x Fronius Symo 20 kW 3 Phase Inverters (240kW AC) |
Extras: | FRONIUS SMART METER – 3 Phase (50 KA), with 3 x 500A Split Core Current Transformers. 15-degree tilt frames with klip-lok (406) mounts for all 732 panels. Certified Grid Safe Network Protection Board. |
Predicted Return on Investment & Savings
Predicted Carbon Avoided: | 440 tonnes Avoided CO₂ per year |
Trees planted over system lifetime: | 84,450 |
Estimated annual power generation: | 410 MWh per year |
Estimated annual savings: | $95k a year inclusive of LGC’s, $4.5mil lifetime |
Installation date: | August 2023 |
System payback period: | 3 years and 8 months |