Knox & District Woodworkers Club

BACKGROUND

As a community men’s group they wanted to engage a local company. As it is a council building there was additional requirement to provide proof of all licences and insurances. Installation was done over 2 days, with impending rain and no interruption to the group’s activities.

Site specifics

No. of panels:52 x LG NeON2 360W (LG360N1C-N5)
System size:18.72kW
Inverter:28 x SolarEdge P730DC optimisers &1 x SolarEdge SE15K 3 phase 15kW inverter
Extras:3 phase SolarEdge Modbus Meter with 3 x CT clamps, for consumption monitoring, all black rail including mid clamps, end clamps & end caps.
3 phase power:Yes

Predicted Return on Investment & savings

Predicted Carbon Avoided:26,100kg CO2 per year
Trees planted over system lifetime:31,071
Estimated annual power generation:24,404kWh’s per year
Estimated annual savings:$4,629 a year, $115,725 lifetime
Installation date:December 2020
System payback period:4 years & 11 months

Customer Feedback

“ With good references from two other nearby installations inspected by Knox & District Woodworkers Club, and the professional commercial approach to detail and follow up provided, we awarded the contract to Total Solar Solutions Australia.
Thanks to Reece, Matt, Jack, Mitch and Naomi for their top workmanship! “